Online Casino

Contact Us

0117 955 1298

info@atollparadise.com

Follow Us
EXC3 Complex Steel Fabrication

EXC3 Complex Steel Fabrication

[gallery link="file" size="full" columns="2" ids="1628,1629,1624,1625,1626,1627"] EXC3 Complex Steel Fabrication in the Heart of Canada Water Docks EXC3 complex steel fabrication maestros Rank Engineering have recently concluded the supply, manufacture and installation of an EXC3, galvanised, steel sub-frame for Galldris.  Markedly, this unique, dipping pond and

Steel Bridge Installation London

Steel Bridge Installation London

[gallery link="file" columns="4" size="medium" ids="1551,1552,1553,1554,1555,1556,1557,1558,1559,1560,1561,1562,1563,1564,1565,1566"] Steel Bridge Installation London: Structural steel experts Rank Engineering are delighted to complete the galvanization and installation of a steel link bridge at Canada Water Docks.  This is the 1st EXC 3 project that we have accomplished, since our extension

Galvanised Structural Metal Fabrication

Galvanised Structural Metal Fabrication

[gallery link="file" ids="1519,1521,1522,1518,1523,1520"] Rank Engineering are delighted to complete the manufacture and installation of a bespoke, infrastructural, galvanised, hopper platform for a leading German aerospace company in Bristol. This custom, structural, metal fabrication enables efficient, waste capture, offering a turnkey solution for optimum recycling in

Structural Steel Erection of South Stand – Memorial Stadium – Bristol Rovers

[gallery link="file" size="full" ids="1452,1453,1454,1471,1470,1455,1457,1473,1468,1469,1467,1456,1472,1464,1463,1458,1459,1460,1462,1461,1465,1466,1449,1450,1451"]

Bristol Steel

Structural Steel Frame in Bristol

[gallery link="file" columns="2" size="large" ids="1193,1194,1195,1196,1197,1198,1199,1200,1201,1202"] Recently concluded, Rank Engineering supplied, delivered and installed, this two-storey, structural steel frame building and cladding rails, for a local customer.  Rank Engineering supply, manufacture and install, structural steel frame building jobs like this, all over the UK.  We conducted

Office Refurbishment for Overbury PLC in Maidenhead, by Bristol’s Rank Engineering

[gallery link="file" size="medium" ids="1073,1074,1075,1076,1077,1078"] Office refurbishment for Overbury PLC in Maidenhead recently completed by Bristol's Rank Engineering.  Rank Engineering managed the project, end-to-end, including the design, fabrication and installation of a bespoke, stair balustrade and bike store and all architectural metalwork, such as aluminium flashings

20 Tonne, 3 Storey, Steel Frame Building in Bristol

[gallery link="file" columns="1" size="full" ids="1070"] Concrete slabs being craned in at Bartley Street, Bedminster, Bristol signifying the completion of a 20 tonne, structural steelwork project by Rank Engineering with 21st Century Building Services Ltd.  #SteelFrameBuildings #StructuralSteel #RankEngineering #StructuralSteelBristol #3StoreySteelFrameBuildings

Berkeley Square

[gallery link="file" columns="2" ids="912,913,914,915"]

St Pauls

[gallery link="file" ids="942,943,944,945,940,941"]

Avonmouth

[gallery link="file" ids="814,816,815"]